Started putting down the wood flooring on Sunday/Monday, then ripped them all back up last night, started taping down strips of fun foam, and putting the flooring bag down last night. It’s tedious (see: I am the for loop.) but the results are quite satisfying.

Even more satisfying is seeing them in action:

Daniel using the lights on top of the active panels

Daniel using the lights on top of the active panels as seen from the panel’s point of view
[X] Strip Cat 5 cables + Glue them to the panels with conductive epoxy
[~50%] Assemble flooring
[ ] Attach Vc to flooring
[REDACTED] Recut 1 servo-box
[ ] Cut 2x 1′ of threaded pipe
[ ] Attach pulley rig to dimmers
[ ] Cut and crimp steel cable.